Qualification Strategy
Change & Second-Source Qualification
Define the evidence needed to introduce component, supplier, material or process changes.
Purpose & Benefit
When This Activity Helps
Use for obsolescence replacements, second sources and manufacturing changes. A risk-based plan helps avoid unnecessary full requalification while addressing changes that could affect reliability.
Project Information
Typical Inputs
The scope is tailored to the available evidence. Useful inputs include:
- Baseline design and proposed change
- Existing qualification and field evidence
- Material, process, supplier and specification differences
Engineering Approach
How SPACEREL Supports Your Project
SPACEREL compares the proposed change with the qualified baseline and identifies affected mechanisms and interfaces. A proportionate analysis and test programme is developed, with traceability to the change risks and customer acceptance requirements.
Documented Outcomes
Typical Deliverables
Deliverables are agreed before work starts and can include:
- Change impact and evidence-gap assessment
- Targeted qualification plan
- Release recommendations based on available evidence
Methods & Evidence
Selected References
- IEC Technical Committee 56: Dependability
Select the applicable methods and requirements for the product and programme.
Project Context
Where This Activity Can Help
Explore the relevant lifecycle stages.